Selected project experience

The work should tell the story.

A showcase of the workmanship and technical expertise behind Phased In’s work. These selected photographs highlight different stages and details from projects we’ve been involved in. Our experience and capabilities extend beyond the work pictured here.

Selected work

Workmanship in focus.

Three cable terminations installed in electrical equipment

Solar · 33kV

Utility-scale solar terminations

Completed cable termination scope documented from preparation through final closeout.

Solar Farm in Kaitaia

Three prepared cables with mechanical connectors during industrial cable jointing works

Factory works · 11kV

Cable joint preparation

Three-phase inline joint repair for an internal factory network.

Napier – Pan Pac Mill

Three indoor cable terminations and shaped cables at a ground mounted transformer on Bowden Road, Auckland

Distribution · 11kV

Ground mounted transformer connection

Carefully shaped indoor cable terminations, finished to a high standard in preparation for livening.

Auckland – Bowden Road

Switchgear and cable terminations at the Puhinui Road project in Auckland

Switchgear · HV

Completed separable terminations

A clean three-phase installation demonstrating consistency, detail and specialist workmanship.

Auckland – Puhinui Road

Cable preparation photographed with a whiteboard recording PL Sub, 33kV Red -TRC, 19 June 2026 and Phased In Ltd

Quality assurance

Descriptive photo documentation

Site, equipment, date and work-stage data embedded in each key project image.

Edgecumbe Bay of Plenty

Cable terminations and equipment connections at Te Puke Substation

Transpower Grid Connection

Substation upgrade works

Completed equipment installation with bonding and phase detail.

Te Puke Substation